Delivery, erection and takedown are often the largest variables on a scaffold quote, and they are not always included. Ask the provider to show each of those items separately, along with the material rental. Give the address, the access for a truck and the dates the scaffold has to be ready for the trades and later cleared.
A materials-only drop leaves you responsible for a complete, legal and stable scaffold. If you want the rental company to erect it, say so in the first request. Include who will meet the crew, where they can stage frames and whether work can happen on a weekend or only during limited hours.
Questions
What is the difference between a drop-off and a full install?
A drop-off delivers frames, planks and hardware for someone else to erect. A full install includes a crew that builds the scaffold and, usually, later takes it down. Ask which one you are being quoted and who is the competent person in each case.
What access does an erection crew need?
They need a place to unload, a path to the wall and a reasonably clear work area along the base. Mention ramps, locked yards, occupied sidewalks and underground work. Photos of the staging area prevent a crew from arriving and being unable to unload.
Can I change the scaffold after it is built?
Often yes, but raising, extending or moving bays is additional labor. Tell the provider which changes you already expect, such as a later raise for a second story. Ask how change orders and added days are priced.
How should I schedule takedown?
Give the provider the date the trades will be finished and any event or occupancy that requires the scaffold to be gone. Ask how much notice it needs and what happens if the work runs late. Name a contact who can walk the site at takedown.